Home » Reef trial to reduce erosion

Reef trial to reduce erosion

City of Cockburn will host Western Australia’s first full-scale trial of an engineered reef designed to slow down coastal erosion by breaking down wave energy reaching the shore.

The reef modules will be constructed from a low carbon concrete, similar to those used at the City’s award-winning Coogee Maritime Trail.

The City has welcomed State Government coastal grants totalling nearly $274,000 to help fund the engineered reef to address persistent and costly erosion at C. Y. O’Connor Beach in North Coogee.

A grant of $214,349 from the Coastal Adaptation & Protection Grants program 2021-22 will help install nearshore engineered reef modules up to 100m in length about 50m offshore from an area of beach that has experienced persistent erosion for more than 20 years.

Another sum of $59,630 will be used to bury a Geotextile Sand Container (GSC) wall in the onshore dunes adjacent to the reef, to act as an erosion ‘backstop’ to protect park assets in rare super-storm events.

Installation is proposed for early 2022, while the GSC wall will likely be installed in spring 2021 or autumn 2022 to coincide with routine sand nourishment at the popular beach.

The City is in discussions with local company Subcon to deliver the project in collaboration with The University of Western Australia, however a formal agreement is yet to be signed.

City of Cockburn Marine and Coastal Engineering Officer, Jonathan McKay said the reef had the potential to control erosion while having minimal impact on the beach, as opposed to more obtrusive conventional groynes and seawalls.

“During community consultation in 2019, feedback indicated options that minimise impact on the appearance and function of the beach were more desirable.

“The information we gain about the reef’s performance over many years will inform the understanding and design of similar ‘engineering with nature’ erosion protection initiatives in Western Australia and around the world.

“While erosion will still occur to some degree, it will happen at a reduced rate, minimising the quantity and frequency of sand nourishment, and allowing for a greater, more stable sand dune buffer to establish along the shoreline.

“The modular reef can be reconfigured, reduced or extended if required. Over time, the reef modules will be colonised by marine flora and fauna as has occurred at the underwater Coogee Maritime Trail, creating another marine habitat that will also be accessible to divers and snorkelers.”

Digital Editions


  • A golden celebration

    A golden celebration

    Cockburn Libraries will mark a major milestone in 2026 – 50 years of serving, supporting and connecting the community. Spearwood Library opened its doors on…

More News

  • Temora address housing shortage in tiny hamlet

    Temora address housing shortage in tiny hamlet

    Proposed Ariah Park Village Subdivision to Address Housing Shortage – Lots from $90-000 to $110,000 in the small picturesque hamlet. Temora Shire Council is investigating the delivery of a proposed…

  • Douglas Shire seeks renewal

    Douglas Shire seeks renewal

    Creative store opens in Mossman through empty spaces program. A new store and community art space has opened in Mossman thanks to a program designed to breathe new life into…

  • New youth and community centre for McLeay

    New youth and community centre for McLeay

    A new Youth and Community Centre planned for Macleay Island will service the needs of the growing community and will also be designed so it can support community recovery following…

  • Grants close soon

    Grants close soon

    Queensland councils have until 31 March to apply for Round two of the State Government’s Secure Communities Partnership Program, which offers up to $400,000 per project for CCTV, lighting and…

  • Sod turned on major upgrade at Paul Fitzsimons Oval

    Sod turned on major upgrade at Paul Fitzsimons Oval

    Work has officially begun on the redevelopment of Paul Fitzsimons Oval with Alice Springs Town Council and the Australian Government turning the first sod this morning. Mayor Asta Hill and…

  • Lockyer send flood expert north

    Lockyer send flood expert north

    Lockyer Valley Regional Council has answered the call for assistance from a community impacted by Ex-Tropical Cyclone Koji, with a staff member from Council’s Disaster Management Unit deployed to support…

  • From books to bots

    From books to bots

    Tenterfield Library is proving that technology is more than just tools and devices. From coding and robotics to tech support, the Library has become a place where curiosity, connection and…

  • Major repairs for levee

    Major repairs for levee

    Goondiwindi Regional Council has endorsed its largest-ever capital works project to repair and reinforce critical sections of the Goondiwindi levee, following significant erosion after recent floods. At this week’s Ordinary…

  • Stretching for a good cause

    Stretching for a good cause

    Ballarat residents stretched, smiled and snuggled their way through a unique Kitten Yoga event that combined relaxation with a heartwarming cause – helping kittens find their forever homes. Hosted by…

  • Murray Library upgrade open

    Murray Library upgrade open

    The Murray Library refurbishment is now complete, and the revitalised space is officially open to the community. The upgrade delivers a brighter, more accessible and flexible library that reflects the…