Home » Maximising infrastructure lifecycles with MAXI-TUBE®*

Maximising infrastructure lifecycles with MAXI-TUBE®*

A new range of innovative Zinc-Alloy coated steel sections has been launched into the Australian market.

Manufactured in Australia by Orrcon Steel, MAXI-TUBE® shows high corrosion resistance for tubular sections in mau aggressive enviroments with good galvanic protection.

Lester Kirkwood, National Sales and Marketing Manager of Orrcon Steel, said the release of MAXI-TUBE® reflected Orrcon Steel’s pursuit of continuous innovation and desire to offer local governments a solution to corrosion issues and sustainability.

“It is a real game-changer for us, suitable for a wide range of structural steel tube and pipe applications where corrosion resistance is required.”

MAXI-TUBE®’s high quality corrosion barrier provides at least 50 percent more durability than standard Hot-Dip Galvanised (HDG) structural steel.

The high corrosion resistance of MAXI-TUBE® provides potential life cycle benefits due to lower maintenence costs and a longer product life.

Further features and benefits of MAXI-TUBE® include:

  • Slower corrosion rate than zinc-coated steel.**
  • Suited for coastal, industrial, intensive farming, food processing and infrastructure applications.
  • Has good paint and powder coat adhesion, plus displays a high quality surface finish.
  • Lead times may be reduced by eliminating steps from traditional coating processes.
  • Achieves life cycle and maintenance cost benefits.
  • Available with a defined warranty.
  • With a coating 2.5 times** harder than galvanised steel, MAXI-TUBE® delivers superior scratch resistance.
  • Aesthetically pleasing mill finish with zero spangle and a smooth satin coating.
  • Demonstrates good weldability for ease of fabrication.

For the first time in Australia, a defined warranty is available for pre-coated zinc-alloy structural tube and pipe used in coastal environments and industrial applications. The availability and extent of any MAXI-TUBE® warranty will depend on the environment and applications in which the product is used.

MAXI-TUBE® can be specified for a range of structural steel applications, including building projects, floor framing, remote housing, playgrounds, shade structures, infrastructure and transport projects in semi-marine & severe marine environments, food & processing industries, corrosive industrial and intensive farming

For further information on MAXI-TUBE® visit www.maxitube.com.au or call Orrcon Steel on 1300 677 266.

*Copy Supplied by Orrcon Steel

**Based on testing conducted by Nisshin Steel Co. Ltd.

Digital Editions


  • A golden celebration

    A golden celebration

    Cockburn Libraries will mark a major milestone in 2026 – 50 years of serving, supporting and connecting the community. Spearwood Library opened its doors on…

More News

  • Temora address housing shortage in tiny hamlet

    Temora address housing shortage in tiny hamlet

    Proposed Ariah Park Village Subdivision to Address Housing Shortage – Lots from $90-000 to $110,000 in the small picturesque hamlet. Temora Shire Council is investigating the delivery of a proposed…

  • Douglas Shire seeks renewal

    Douglas Shire seeks renewal

    Creative store opens in Mossman through empty spaces program. A new store and community art space has opened in Mossman thanks to a program designed to breathe new life into…

  • New youth and community centre for McLeay

    New youth and community centre for McLeay

    A new Youth and Community Centre planned for Macleay Island will service the needs of the growing community and will also be designed so it can support community recovery following…

  • Grants close soon

    Grants close soon

    Queensland councils have until 31 March to apply for Round two of the State Government’s Secure Communities Partnership Program, which offers up to $400,000 per project for CCTV, lighting and…

  • Sod turned on major upgrade at Paul Fitzsimons Oval

    Sod turned on major upgrade at Paul Fitzsimons Oval

    Work has officially begun on the redevelopment of Paul Fitzsimons Oval with Alice Springs Town Council and the Australian Government turning the first sod this morning. Mayor Asta Hill and…

  • Lockyer send flood expert north

    Lockyer send flood expert north

    Lockyer Valley Regional Council has answered the call for assistance from a community impacted by Ex-Tropical Cyclone Koji, with a staff member from Council’s Disaster Management Unit deployed to support…

  • From books to bots

    From books to bots

    Tenterfield Library is proving that technology is more than just tools and devices. From coding and robotics to tech support, the Library has become a place where curiosity, connection and…

  • Major repairs for levee

    Major repairs for levee

    Goondiwindi Regional Council has endorsed its largest-ever capital works project to repair and reinforce critical sections of the Goondiwindi levee, following significant erosion after recent floods. At this week’s Ordinary…

  • Stretching for a good cause

    Stretching for a good cause

    Ballarat residents stretched, smiled and snuggled their way through a unique Kitten Yoga event that combined relaxation with a heartwarming cause – helping kittens find their forever homes. Hosted by…

  • Murray Library upgrade open

    Murray Library upgrade open

    The Murray Library refurbishment is now complete, and the revitalised space is officially open to the community. The upgrade delivers a brighter, more accessible and flexible library that reflects the…