Home » Timber – the ultimate renewable*

Timber – the ultimate renewable*

Bunjil Place in Victoria – an award winning example of the ultimate renewable in action.

Responsibly sourced wood is the only major building material that helps tackle climate change. 

It’s renewable – ‘the ultimate renewable’ – it stores carbon for the life of the building and has much lower embodied energy – ‘upfront carbon emissions’ – than conventional, more carbon-intensive building materials.

When people think of renewables, they tend to think of wind farms or solar panels, but they don’t think of forests or building with wood. 

Wood is the only major renewable building material currently available anywhere in the world.

At Planet Ark we often talk about a concept called ‘Ecological Footprinting’ – living on nature’s interest, not its capital. 

In a Yale University study completed in 2014, the researchers concluded that the world’s forests contain a total volume of wood of 385 billion cubic metres. 

They also found that an additional 17 billion cubic metres is grown every year, of which we consume 3.4 billion cubic metres, about 20 percent of the additional growth. 

Hence using wood we are building using nature’s interest, not its capital. No other building material can make that claim.

By way of an example the tallest timber building in the world was, until recently, a university residence building in Vancouver, Canada, known as Brock Commons. 

It is 18 storeys or 53 metres tall, and incorporates 2233 cubic metres of Cross-Laminated Timber (CLT) and Glued Laminated Timber (Glulam) in its structure.

Calculations have shown that the volume of timber used in the building will be regrown in United States and Canadian forests in a mere six minutes. 

Similarly, an average sized Australian frame and truss house will contain about 12 cubic metres of pine, which will be regrown in Australian pine plantations in less than a minute. 

When wood is harvested today, it’s replanted for tomorrow. That’s why wood is called ‘the ultimate renewable’.

In many parts of the world, including Australia, the renaissance of timber construction is developing rapidly. 

There are many fine examples of this, including Bunjil Place in Narre Warren, Victoria, winner of the Grand Prix in the 2018 Australian Timber Design Awards.

Bunjil Place is a community and civic building used as a library, performance theatre, a public gathering space, and place of exhibition, gallery and display. 

The entrance foyer contains an impressive timber grid shell that dominates and defines the atrium. 

The central theme was the interpretation of land by the traditional owners and inhabitants of the land. 

The foyer’s design reflects the ‘eagle’, with its wings spread and forming a protective shelter to the community the building serves. 

As the architects intended, the timber grid shell appears to be weightless as it lightly touches the ground at two points. 

The use of wood provides a warm and innovative design which emphasises the lightness of the roof through a fluid, organic geometry while reinforcing the welcoming
nature of the complex.

The built environment is the primary source of carbon dioxide emissions in Australia and around the world. 

Following the lead taken by Francis-Jones Morehen Thorp on Bunjil Place, the use of more responsibly sourced wood in construction undoubtedly has the potential to significantly reduce the impact of climate change.

For more information please contact David Rowlinson, Make It Wood Campaign Manager, at david@planetark.org or 0400 474 412 or visit makeitwood.org.

*Copy supplied by Planet Ark

Digital Editions


  • Leaving on a high

    Leaving on a high

    Mount Alexander Shire Council’s Chief Executive Officer Darren Fuzzard will end his tenure at the council in July 2026, marking ten years of service to…

More News

  • Baw Baw acting CEO tenure extended

    Baw Baw acting CEO tenure extended

    Baw Baw Shire Council has extended the contract of Acting Chief Executive Officer Sally Jones until 30 June 2026. The matter was considered as a confidential item in the late…

  • Farewell to a much-loved bridge

    Farewell to a much-loved bridge

    Narrabri Shire Council hosted a special community farewell event in mid-January, Brekkie on the Bridge, ahead of the upcoming demolition of the Violet Street Bridge. The event brought together community…

  • Toolkit provides resources for staff to live values

    Toolkit provides resources for staff to live values

    Organisational values are at the core of every workday and task and Bundaberg Regional Council has developed a practical tool kit to support its workforce and promote its values. The…

  • New system for Blacktown

    New system for Blacktown

    Blacktown City Council has launched DAISY, a new digital planning assistant designed to help residents better understand planning requirements and prepare residential development applications. DAISY, which stands for Development Application…

  • NSW mourns long-serving Governor

    NSW mourns long-serving Governor

    On behalf of the family of Dame Marie Bashir, I am saddened to share the news of her passing. Married to Sir Nicholas Shehadie AC OBE for 61 years, and…

  • Jack Iori honored by the Hills.

    Jack Iori honored by the Hills.

    The Hills Shire Council has officially named the grandstand at Kellyville Memorial Park Community Centre the Jack Iori Grandstand, recognising the enormous impact Jack Iori OAM has had on rugby…

  • Farmers urged to register for rural aid

    Farmers urged to register for rural aid

    Farmers across Australia – particularly those in disaster-impacted regions – have been strongly encouraged to register with Rural Aid now, as ongoing natural disasters and worsening weather conditions continue to…

  • Coonabarabran VIC punches above it’s weight

    Coonabarabran VIC punches above it’s weight

    Warrumbungle Shire Council has welcomed new data confirming the Coonabarabran Visitor Information Centre as one of the top three performing Visitor Information Centres in New South Wales. Official figures released…

  • Storm-proofing Seymour River Bridge is long overdue

    Storm-proofing Seymour River Bridge is long overdue

    If I had a dollar for every time I saw the question, “Is the Seymour River Bridge open?” on social media, the upgrade to that stretch of road might already…

  • Newcastle Lord Mayor resigns

    Newcastle Lord Mayor resigns

    Newcastle Lord Mayor Cr Ross Kerridge resigned from his role as Lord Mayor of Newcastle in early February. The Lord Mayor wrote to City of Newcastle CEO Jeremy Bath to…