Home » Improving water quality from backyard to Bay

Improving water quality from backyard to Bay

Council’s Integrated Water Management Project is a positive step in improving the sustainability of water and sewerage provision in Brisbane, focusing on the whole urban water cycle. The project focuses on the interruption to the water cycle through catchment and supply, storm water management, and finally outfall into the ocean.

Brisbane’s commitment to storm water management is highlighted through its Urban Stormwater Management Strategy (USMS).

Development of Natural Channel Design Guidelines (NCD) and implementation of Water Sensitive Urban Design principles are among the key strategies outlined in USMS. NCD Guidelines are currently being used by Council and developers for rehabilitation of degraded waterways.

Barry Ball, Manager of Council’s Waterways program, highlighted an example of the Natural Channel Design Guideline put into action.

“The Bowman Park, Bandon Creek Rehabilitation Project is an excellent example of Council applying the Natural Channel Design Guideline,” he said. “The project aimed to transform a low flow concrete channel into a functioning frog habitat, which previously existed before the construction of the channel 12 years ago.”

With the support of the Queensland Frog Society and the local community, Council removed the Bowman Park concrete drain and replaced it with a series of pools, rifles and other semi permanent water features. The venture resulted in a significant improvement in the natural beauty of the area and the ecological characteristics of the channel, while maintaining the efficiency of the local stormwater system.

In an attempt to improve water quality in Brisbane’s bays, Council makes use of over 70 regional Stormwater Quality Improvement Devices (SQIDs). These devices include gross pollutant traps, oil/sediment traps, grass swales and natural filtration systems such as ponds and wetlands.

One of the SQIDs planned for this year is the Bridgewater Creek Water Quality Improvement Project – a constructed wetland system that will filter the stormwater runoff that enters Bridgewater Creek from local neighbourhoods. The wetland is designed to collect large items of rubbish, coarse particles of sand and soil, very fine particles of soil and silt and other harmful pollutants.

“In addition to improving water quality, the wetlands will enhance the visual appearance of the area, reduce flooding, provide opportunities for recreation and education and demonstrate how residents can help improve our wetlands,” Barry Ball said.

For further information on these projects contact Barry Ball on (07) 3403 4870.

Digital Editions


  • A golden celebration

    A golden celebration

    Cockburn Libraries will mark a major milestone in 2026 – 50 years of serving, supporting and connecting the community. Spearwood Library opened its doors on…

More News

  • Temora address housing shortage in tiny hamlet

    Temora address housing shortage in tiny hamlet

    Proposed Ariah Park Village Subdivision to Address Housing Shortage – Lots from $90-000 to $110,000 in the small picturesque hamlet. Temora Shire Council is investigating the delivery of a proposed…

  • Douglas Shire seeks renewal

    Douglas Shire seeks renewal

    Creative store opens in Mossman through empty spaces program. A new store and community art space has opened in Mossman thanks to a program designed to breathe new life into…

  • New youth and community centre for McLeay

    New youth and community centre for McLeay

    A new Youth and Community Centre planned for Macleay Island will service the needs of the growing community and will also be designed so it can support community recovery following…

  • Grants close soon

    Grants close soon

    Queensland councils have until 31 March to apply for Round two of the State Government’s Secure Communities Partnership Program, which offers up to $400,000 per project for CCTV, lighting and…

  • Sod turned on major upgrade at Paul Fitzsimons Oval

    Sod turned on major upgrade at Paul Fitzsimons Oval

    Work has officially begun on the redevelopment of Paul Fitzsimons Oval with Alice Springs Town Council and the Australian Government turning the first sod this morning. Mayor Asta Hill and…

  • Lockyer send flood expert north

    Lockyer send flood expert north

    Lockyer Valley Regional Council has answered the call for assistance from a community impacted by Ex-Tropical Cyclone Koji, with a staff member from Council’s Disaster Management Unit deployed to support…

  • From books to bots

    From books to bots

    Tenterfield Library is proving that technology is more than just tools and devices. From coding and robotics to tech support, the Library has become a place where curiosity, connection and…

  • Major repairs for levee

    Major repairs for levee

    Goondiwindi Regional Council has endorsed its largest-ever capital works project to repair and reinforce critical sections of the Goondiwindi levee, following significant erosion after recent floods. At this week’s Ordinary…

  • Stretching for a good cause

    Stretching for a good cause

    Ballarat residents stretched, smiled and snuggled their way through a unique Kitten Yoga event that combined relaxation with a heartwarming cause – helping kittens find their forever homes. Hosted by…

  • Murray Library upgrade open

    Murray Library upgrade open

    The Murray Library refurbishment is now complete, and the revitalised space is officially open to the community. The upgrade delivers a brighter, more accessible and flexible library that reflects the…