Home » Sustainable waste management

Sustainable waste management

With a population of almost 124,000 people and up to 40,000 additional visitors each night, sustainable management of wastewater and domestic garbage generated is a key challenge for the City of Cairns. Faced with its landfill quickly running out of space, and no chance of gaining approval for a new site on the coast, Council sought out alternative technologies.

“With landfill an unsustainable method of disposal, and transporting waste to a new site on the Atherton tablelands economically prohibitive, Council has entered a 25 year contract, to compost kerbside waste with sewerage sludge from our waste water plants,” said Brian Smyth, General Manager Cairns Water.

Under this agreement, Council has provided the land for Bedminster Bioconversion Pty Ltd to construct its state of the art Resource Recovery Centre. The $27 million plant covers an area a little over the size of two football fields. Expected to come on line in April, organic materials are separated from the waste stream and the composted with sewerage sludge.

The Resource Recovery Centre, located in Cairns will process and recover valuable resources for the City of Cairns, and the neighbouring Shires of Mareeba and Douglas. With 30 years of experience, the Bedminster Technology has stringent environmental controls with all processing taking place inside the new complex. Its enclosed system means odour is totally controlled and there is no risk of contamination to stormwater or ground water.

The composting process is aerobic producing no methane, a key contributor to Greenhouse gases from traditional landfill operations. This process can reduce waste going to landfill by at least 70 percent. Materials that cannot be composted are deposited to landfill but without the problems of methane or leachate. The Bedminster end product is a fertility enhancing, safe and effective soil conditioner, ideal as a replenishment Australia’s depleted topsoils. The product can also be used as a renewable fuel source for local industry, such as sugar refining, for the generation of electricity.

Under this public/private partnership, Bedmister has built and will own and operate the process plant. The three Councils pay a monthly fixed fee and a set payment for every tonne processed. The Bedmister Technology was selected following a formal tender process. The contract is in three phases – gaining the necessary approvals; design and construction; and operation.

The plant, for all intents and purposes, looks like a large warehouse. Through Bedminster’s system of biofilters, comprising layers of gravel, compost and wood chips, any unpleasant odours are eliminated. The Cairns plant is the largest to be constructed in Australia to date, with a smaller plant in Port Stephen and another servicing the Southern Metropolitan Regional Council in Perth.

“This major project is more than meeting Government targets to reduce our waste to landfill by 50 percent,” Brian Smyth said. “It is also meeting community demands to protect the environment by reducing, re-using and recycling waste.”

Digital Editions


  • Greater Geraldton bridge lauded

    Greater Geraldton bridge lauded

    City of Greater Geraldton bridge replacement project wins prestigious engineering award Inovative engineering has earned the recently completed Nangetty-Walkaway Road Bridge Replacement Project top honours…

More News

  • Big attraction for tiny town

    Big attraction for tiny town

    Dozens of tourists have created history as the first passengers in decades to arrive in the tiny southern Queensland town of Thallon by rail. Excited passengers travelled for hours on…

  • Together Butchulla Talk

    Together Butchulla Talk

    A new Indigenous book celebrating the Butchulla language and local animals was launched at Hervey Bay Library earlier this month with storytime, language, dance and art activities for families to…

  • New Logan arena

    New Logan arena

    An upgraded arena for equestrians has officially opened at Skerman Park in North Maclean. Logan City Council delivered the $928,000 project, which includes a weatherproof roof, to support members of…

  • Noosa mastering AI

    Noosa mastering AI

    Digital Hub is trying to help Noosa locals get the most out of AI. Mastering AI can make life easier in countless ways. From planning weekly meals with specific dietary…

  • Change in the weather

    Change in the weather

    AUSSIE FLOOD RESCUE It’s obvious to everybody that we are seeing weather changes. It appears to be more erratic and frequent than ever before. Local government bodies are plagued by…

  • Dandycon set to return

    Dandycon set to return

    Dandy Con, Greater Dandenong’s much loved comic and pop culture festival, returns on Saturday 11 April 2026 between 11am–4pm, bigger than ever. This free, all ages event fills Dandenong Library,…

  • A creative future for Kingston

    A creative future for Kingston

    The community has been invited to help shape Kingston’s creative and cultural future. Kingston residents are being invited to help finalise the city’s cultural roadmap, with the Draft Creative and…

  • Tweed residents gunking up wastewater

    Tweed residents gunking up wastewater

    Tweed Shire Council is urging residents to rethink what they flush down the toilet and pour down the drain, after revealing that crews remove around 156 tonnes of rubbish and…

  • In memory of Chris Quilkey

    In memory of Chris Quilkey

    It was with great sadness that we learned that former Blacktown City Deputy Mayor and Councillor Chris Quilkey has passed away. First and foremost, our thoughts are with Chris’s family,…

  • Unit demolished as Ipswich flood recovery continues

    Unit demolished as Ipswich flood recovery continues

    Ipswich Mayor Teresa Harding has welcomed the demolition of Mihi Grove, a flood-hit 42-unit complex in Brassall purchased as part of the Queensland and Australian Government’s Resilient Homes Fund Voluntary…