Home » New works depot bucks trend

New works depot bucks trend

East Gippsland Shire has a new, state-of-the-art works depot, built to accommodate in-house works crews and associated equipment — an outstanding testimony to Council’s strategic thinking.

Following a review of the way that East Gippsland Shire Council delivered its physical services to ratepayers and visitors, Council resolved to ‘buck the trend’, moving from external contracted service providers to in-house works teams in the areas of parks and gardens, tree maintenance and waste management.

As a result of this move, and with the hiring of an additional 30 Operations staff to add to the 45 existing staff, plus the need to house machinery and equipment, Council decided to establish a new, purpose-built depot.

Council’s Chief Executive Officer, Steve Kozlowski, said that the move to in-house and place-based works teams was undertaken to improve the quality and responsiveness of the services provided to the community, as well as creating localised employment opportunities.

“As part of the process, it was also decided to combine all infrastructure management and maintenance staff of Council’s Operations Department into a single location to maximise efficiencies of service delivery across all areas of Council’s infrastructure. Therefore, the depot had to accommodate the needs of indoor and outdoor staff, as well as plant and equipment,” said Mr Kozlowski.

“This required an extensive and modern new depot, built to a sustainable, leading edge standard on a ‘greenfield’ site.”

The project was managed by Council’s Senior Works Coordinator, Mick Veldhuizen, and consisted of the use of sub-contractors for earthworks and road pavement construction, pavement asphalting, steel work, tilt slabs, plumbing, and electrical and heating/air conditioning services. Council’s in-house crews undertook the extensive concreting and carpentry works.

To ensure that the desired environmental and sustainable credentials of the project were met, the following features were included in the project:

  • harvesting of rainwater for use in toilets, gardens and the truck wash bay
  • LED lighting in the workshops
  • motion sensor lighting in the other buildings
  • only bio-diesel available at the refuelling facility
  • solar hot water to the amenities building
  • double-glazing in the office building
  • sewerage treated to Class C standard used by East Gippsland Water for irrigation of nearby pasture
  • bio-filtration of stormwater from the site and
  • three AusGeothermal heat pumps in the office building provide heating/air-conditioning and hot water.

This state-of-the-art works depot is the direct result of organisational teamwork and cooperation, reflecting the efforts of many individuals and departments within the East Gippsland Shire Council.

The project has been nominated for the Institute of Public Works Engineering Australia 2013 Excellence Awards.

Digital Editions


  • A golden celebration

    A golden celebration

    Cockburn Libraries will mark a major milestone in 2026 – 50 years of serving, supporting and connecting the community. Spearwood Library opened its doors on…

More News

  • Temora address housing shortage in tiny hamlet

    Temora address housing shortage in tiny hamlet

    Proposed Ariah Park Village Subdivision to Address Housing Shortage – Lots from $90-000 to $110,000 in the small picturesque hamlet. Temora Shire Council is investigating the delivery of a proposed…

  • Douglas Shire seeks renewal

    Douglas Shire seeks renewal

    Creative store opens in Mossman through empty spaces program. A new store and community art space has opened in Mossman thanks to a program designed to breathe new life into…

  • New youth and community centre for McLeay

    New youth and community centre for McLeay

    A new Youth and Community Centre planned for Macleay Island will service the needs of the growing community and will also be designed so it can support community recovery following…

  • Grants close soon

    Grants close soon

    Queensland councils have until 31 March to apply for Round two of the State Government’s Secure Communities Partnership Program, which offers up to $400,000 per project for CCTV, lighting and…

  • Sod turned on major upgrade at Paul Fitzsimons Oval

    Sod turned on major upgrade at Paul Fitzsimons Oval

    Work has officially begun on the redevelopment of Paul Fitzsimons Oval with Alice Springs Town Council and the Australian Government turning the first sod this morning. Mayor Asta Hill and…

  • Lockyer send flood expert north

    Lockyer send flood expert north

    Lockyer Valley Regional Council has answered the call for assistance from a community impacted by Ex-Tropical Cyclone Koji, with a staff member from Council’s Disaster Management Unit deployed to support…

  • From books to bots

    From books to bots

    Tenterfield Library is proving that technology is more than just tools and devices. From coding and robotics to tech support, the Library has become a place where curiosity, connection and…

  • Major repairs for levee

    Major repairs for levee

    Goondiwindi Regional Council has endorsed its largest-ever capital works project to repair and reinforce critical sections of the Goondiwindi levee, following significant erosion after recent floods. At this week’s Ordinary…

  • Stretching for a good cause

    Stretching for a good cause

    Ballarat residents stretched, smiled and snuggled their way through a unique Kitten Yoga event that combined relaxation with a heartwarming cause – helping kittens find their forever homes. Hosted by…

  • Murray Library upgrade open

    Murray Library upgrade open

    The Murray Library refurbishment is now complete, and the revitalised space is officially open to the community. The upgrade delivers a brighter, more accessible and flexible library that reflects the…