Home » Editorial: long term planning key to sustainability

Editorial: long term planning key to sustainability

In this edition we are featuring various Councils’ approaches to addressing the challenges of financial sustainability and asset management (refer pages 11 to 20). With recent Local Government financial sustainability studies, at both the national and state level, key findings are that, across the board Councils are struggling with an ever increasing infrastructure backlog, and this is throwing doubt on a number of Councils’ ongoing financial viability.

There is a growing recognition across all spheres of government that financial sustainability and asset management are inextricably interwoven and must be treated as such. However, the reality of political life means that elected members tend to be primarily focused on the next election. This results in long term plans, say over the next ten or 20 years, being somewhat off the radar.

Similarly with the community, people are more than happy to see new capital projects, such as new sports facilities, roads and the like, but few realise that on average the initial outlay for these projects is likely to be around 20 per cent of the total life cycle costs, not to mention ultimate replacement once the facility reaches its used-by date.

Without long term planning to address these issues, future generations will face massive debt, resulting in higher rates and charges or severely reduced services, and possibly both.

So where to start? It is vital that Councils understand the range of assets they hold stewardship over, and the current condition they are in.

But assessing this can be a time consuming and resource hungry task. The Institute of Public Works Engineering Australia (IPWEA) believes that many organisations can get lost in the collection of data and the selection and implementation of software systems.

As a result, IPWEA’s International Infrastructure Management Manual (IIMM) sets out two levels of asset management: core and advanced. It advocates that at the outset Councils formulate their asset management plan using a ‘core’ or basic approach. This will avoid it becoming too complicated or getting lost in a never ending cycle of data collection.

IPWEA suggests that Councils develop an asset management plan that initially meets only the minimum legislative, accounting or Council’s own requirements rather than waiting until more information becomes available or improved systems and processes are in place.

After the development of this initial plan, asset management will start to evolve in a continuous cycle of review and improvement so the quality of outputs matches the changing business needs of a Council.

IPWEA believes that some Councils’ asset management planning may not need to progress beyond this core approach.

‘Advanced’ asset management applies analysis to individual assets compared with a core approach that looks at assets at a network level. According to IPWEA, an advanced asset management plan, as opposed to a core plan, will be supported by well defined and agreed levels of service. It will rely on accurate and detailed asset data, with minimal assumptions and high confidence levels.

Future development of the IPWEA NAMS.PLUS program will assist Councils pursuing advanced asset management. However, IPWEA’s current focus is targeted at assisting Councils to achieve a ‘core’ approach to asset management planning.

Maintaining and renewing infrastructure for the long term is certainly having significant impacts on the financial sustainability of Local Government. With an estimated 35 per cent of Councils in Australia deemed unsustainable, reform cannot be delayed.

Councils must move from annual budgeting to long term financial planning, and long term financial plans need to be founded on sound asset management plans.

Digital Editions


  • Greater Geraldton bridge lauded

    Greater Geraldton bridge lauded

    City of Greater Geraldton bridge replacement project wins prestigious engineering award Inovative engineering has earned the recently completed Nangetty-Walkaway Road Bridge Replacement Project top honours…

More News

  • Big attraction for tiny town

    Big attraction for tiny town

    Dozens of tourists have created history as the first passengers in decades to arrive in the tiny southern Queensland town of Thallon by rail. Excited passengers travelled for hours on…

  • Together Butchulla Talk

    Together Butchulla Talk

    A new Indigenous book celebrating the Butchulla language and local animals was launched at Hervey Bay Library earlier this month with storytime, language, dance and art activities for families to…

  • New Logan arena

    New Logan arena

    An upgraded arena for equestrians has officially opened at Skerman Park in North Maclean. Logan City Council delivered the $928,000 project, which includes a weatherproof roof, to support members of…

  • Noosa mastering AI

    Noosa mastering AI

    Digital Hub is trying to help Noosa locals get the most out of AI. Mastering AI can make life easier in countless ways. From planning weekly meals with specific dietary…

  • Change in the weather

    Change in the weather

    AUSSIE FLOOD RESCUE It’s obvious to everybody that we are seeing weather changes. It appears to be more erratic and frequent than ever before. Local government bodies are plagued by…

  • Dandycon set to return

    Dandycon set to return

    Dandy Con, Greater Dandenong’s much loved comic and pop culture festival, returns on Saturday 11 April 2026 between 11am–4pm, bigger than ever. This free, all ages event fills Dandenong Library,…

  • A creative future for Kingston

    A creative future for Kingston

    The community has been invited to help shape Kingston’s creative and cultural future. Kingston residents are being invited to help finalise the city’s cultural roadmap, with the Draft Creative and…

  • Tweed residents gunking up wastewater

    Tweed residents gunking up wastewater

    Tweed Shire Council is urging residents to rethink what they flush down the toilet and pour down the drain, after revealing that crews remove around 156 tonnes of rubbish and…

  • In memory of Chris Quilkey

    In memory of Chris Quilkey

    It was with great sadness that we learned that former Blacktown City Deputy Mayor and Councillor Chris Quilkey has passed away. First and foremost, our thoughts are with Chris’s family,…

  • Unit demolished as Ipswich flood recovery continues

    Unit demolished as Ipswich flood recovery continues

    Ipswich Mayor Teresa Harding has welcomed the demolition of Mihi Grove, a flood-hit 42-unit complex in Brassall purchased as part of the Queensland and Australian Government’s Resilient Homes Fund Voluntary…