Home » New works depot bucks trend

New works depot bucks trend

East Gippsland Shire has a new, state-of-the-art works depot, built to accommodate in-house works crews and associated equipment — an outstanding testimony to Council’s strategic thinking.

Following a review of the way that East Gippsland Shire Council delivered its physical services to ratepayers and visitors, Council resolved to ‘buck the trend’, moving from external contracted service providers to in-house works teams in the areas of parks and gardens, tree maintenance and waste management.

As a result of this move, and with the hiring of an additional 30 Operations staff to add to the 45 existing staff, plus the need to house machinery and equipment, Council decided to establish a new, purpose-built depot.

Council’s Chief Executive Officer, Steve Kozlowski, said that the move to in-house and place-based works teams was undertaken to improve the quality and responsiveness of the services provided to the community, as well as creating localised employment opportunities.

“As part of the process, it was also decided to combine all infrastructure management and maintenance staff of Council’s Operations Department into a single location to maximise efficiencies of service delivery across all areas of Council’s infrastructure. Therefore, the depot had to accommodate the needs of indoor and outdoor staff, as well as plant and equipment,” said Mr Kozlowski.

“This required an extensive and modern new depot, built to a sustainable, leading edge standard on a ‘greenfield’ site.”

The project was managed by Council’s Senior Works Coordinator, Mick Veldhuizen, and consisted of the use of sub-contractors for earthworks and road pavement construction, pavement asphalting, steel work, tilt slabs, plumbing, and electrical and heating/air conditioning services. Council’s in-house crews undertook the extensive concreting and carpentry works.

To ensure that the desired environmental and sustainable credentials of the project were met, the following features were included in the project:

  • harvesting of rainwater for use in toilets, gardens and the truck wash bay
  • LED lighting in the workshops
  • motion sensor lighting in the other buildings
  • only bio-diesel available at the refuelling facility
  • solar hot water to the amenities building
  • double-glazing in the office building
  • sewerage treated to Class C standard used by East Gippsland Water for irrigation of nearby pasture
  • bio-filtration of stormwater from the site and
  • three AusGeothermal heat pumps in the office building provide heating/air-conditioning and hot water.

This state-of-the-art works depot is the direct result of organisational teamwork and cooperation, reflecting the efforts of many individuals and departments within the East Gippsland Shire Council.

The project has been nominated for the Institute of Public Works Engineering Australia 2013 Excellence Awards.

Digital Editions


  • Greater Geraldton bridge lauded

    Greater Geraldton bridge lauded

    City of Greater Geraldton bridge replacement project wins prestigious engineering award Inovative engineering has earned the recently completed Nangetty-Walkaway Road Bridge Replacement Project top honours…

More News

  • Big attraction for tiny town

    Big attraction for tiny town

    Dozens of tourists have created history as the first passengers in decades to arrive in the tiny southern Queensland town of Thallon by rail. Excited passengers travelled for hours on…

  • Together Butchulla Talk

    Together Butchulla Talk

    A new Indigenous book celebrating the Butchulla language and local animals was launched at Hervey Bay Library earlier this month with storytime, language, dance and art activities for families to…

  • New Logan arena

    New Logan arena

    An upgraded arena for equestrians has officially opened at Skerman Park in North Maclean. Logan City Council delivered the $928,000 project, which includes a weatherproof roof, to support members of…

  • Noosa mastering AI

    Noosa mastering AI

    Digital Hub is trying to help Noosa locals get the most out of AI. Mastering AI can make life easier in countless ways. From planning weekly meals with specific dietary…

  • Change in the weather

    Change in the weather

    AUSSIE FLOOD RESCUE It’s obvious to everybody that we are seeing weather changes. It appears to be more erratic and frequent than ever before. Local government bodies are plagued by…

  • Dandycon set to return

    Dandycon set to return

    Dandy Con, Greater Dandenong’s much loved comic and pop culture festival, returns on Saturday 11 April 2026 between 11am–4pm, bigger than ever. This free, all ages event fills Dandenong Library,…

  • A creative future for Kingston

    A creative future for Kingston

    The community has been invited to help shape Kingston’s creative and cultural future. Kingston residents are being invited to help finalise the city’s cultural roadmap, with the Draft Creative and…

  • Tweed residents gunking up wastewater

    Tweed residents gunking up wastewater

    Tweed Shire Council is urging residents to rethink what they flush down the toilet and pour down the drain, after revealing that crews remove around 156 tonnes of rubbish and…

  • In memory of Chris Quilkey

    In memory of Chris Quilkey

    It was with great sadness that we learned that former Blacktown City Deputy Mayor and Councillor Chris Quilkey has passed away. First and foremost, our thoughts are with Chris’s family,…

  • Unit demolished as Ipswich flood recovery continues

    Unit demolished as Ipswich flood recovery continues

    Ipswich Mayor Teresa Harding has welcomed the demolition of Mihi Grove, a flood-hit 42-unit complex in Brassall purchased as part of the Queensland and Australian Government’s Resilient Homes Fund Voluntary…