Home » Townsville builds better bridges

Townsville builds better bridges

Townsville City Council’s trade team are extending the life of council assets around Townsville by working smarter with new, innovative and recycled materials.

Council has been replacing a number of aging footbridges in record time by taking the construction in-house, literally, with the team constructing modular footbridges in the warehouse at the Garbutt Operations Centre.

By utilising new and innovative products such as Replas recycled plastic and reinforced composite fibre, the bridges are built as modular units and craned into place, saving council time and ratepayers’ money.

Chair of Council’s Infrastructure Services Committee, Cr Kurt Rehbein said the new fibrous reinforced products were significantly lighter than using timber and steel and were uniquely suited to withstand the harshest environments.

“These products provide a low maintenance, long life asset to the community,” Cr Rehbein said.

“Another big advantage with this system is that it allows council to build the bridges in our warehouse, not having to fight with nature’s elements.”

Building a bridge onsite could take as long as 10 days, which means it is closed to pedestrians for at least that amount of time.

Now by building inhouse most of the time council’s teams can leave the existing bridge in place until it’s time to crane in the new structure, minimising closure times.

“Council is passionate about our active transport network and creating connected communities, so it’s always great to be able to add to the liveability of our city,” Cr Rehbein said.

“The new products have a much better life span and I think that it’s great that we have been able to learn what products will offer best value for money over the life of the asset, plus termites don’t eat plastic.

“This approach is also an example of council’s work to embed circular economy principles in the renewal of our assets.”

“Council is also passionate about our active transport network and creating connected communities, so it’s always great to be able to add to the liveability of our city.”

The team recently replaced a 10.2-metre pedestrian footbridge in Mount Louisa in a matter of days, craning the 3.4 tonne bridge into place, replacing the old timber asset which would have been significantly heavier.

Digital Editions


  • Greater Geraldton bridge lauded

    Greater Geraldton bridge lauded

    City of Greater Geraldton bridge replacement project wins prestigious engineering award Inovative engineering has earned the recently completed Nangetty-Walkaway Road Bridge Replacement Project top honours…

More News

  • Big attraction for tiny town

    Big attraction for tiny town

    Dozens of tourists have created history as the first passengers in decades to arrive in the tiny southern Queensland town of Thallon by rail. Excited passengers travelled for hours on…

  • Together Butchulla Talk

    Together Butchulla Talk

    A new Indigenous book celebrating the Butchulla language and local animals was launched at Hervey Bay Library earlier this month with storytime, language, dance and art activities for families to…

  • New Logan arena

    New Logan arena

    An upgraded arena for equestrians has officially opened at Skerman Park in North Maclean. Logan City Council delivered the $928,000 project, which includes a weatherproof roof, to support members of…

  • Noosa mastering AI

    Noosa mastering AI

    Digital Hub is trying to help Noosa locals get the most out of AI. Mastering AI can make life easier in countless ways. From planning weekly meals with specific dietary…

  • Change in the weather

    Change in the weather

    AUSSIE FLOOD RESCUE It’s obvious to everybody that we are seeing weather changes. It appears to be more erratic and frequent than ever before. Local government bodies are plagued by…

  • Dandycon set to return

    Dandycon set to return

    Dandy Con, Greater Dandenong’s much loved comic and pop culture festival, returns on Saturday 11 April 2026 between 11am–4pm, bigger than ever. This free, all ages event fills Dandenong Library,…

  • A creative future for Kingston

    A creative future for Kingston

    The community has been invited to help shape Kingston’s creative and cultural future. Kingston residents are being invited to help finalise the city’s cultural roadmap, with the Draft Creative and…

  • Tweed residents gunking up wastewater

    Tweed residents gunking up wastewater

    Tweed Shire Council is urging residents to rethink what they flush down the toilet and pour down the drain, after revealing that crews remove around 156 tonnes of rubbish and…

  • In memory of Chris Quilkey

    In memory of Chris Quilkey

    It was with great sadness that we learned that former Blacktown City Deputy Mayor and Councillor Chris Quilkey has passed away. First and foremost, our thoughts are with Chris’s family,…

  • Unit demolished as Ipswich flood recovery continues

    Unit demolished as Ipswich flood recovery continues

    Ipswich Mayor Teresa Harding has welcomed the demolition of Mihi Grove, a flood-hit 42-unit complex in Brassall purchased as part of the Queensland and Australian Government’s Resilient Homes Fund Voluntary…