Home » Using GIS/GPS to monitor and maintain drainage pits

Using GIS/GPS to monitor and maintain drainage pits

Inspections and works orders of drainage infrastructure comprising 36,000 pits and hundreds of kilometres of pipes are now considerably easier for Frankston City Council with the implementation of a customised GIS application connected to GPS.

Developed by Council’s Senior GIS/GPS Projects Specialist, Paul Bormann, the application was first used by Frankston’s drainage department in 2006. Since then, it has been continually updated in stages to broaden its features and capabilities.

Paul Bormann said it was initially implemented to assist field workers locate and inspect drainage pits and record maintenance data, but its use has been expanded to include job prioritisation and sequencing, as well as yearly and quarterly proactive inspection cycles.

“The innovative solution now overcomes all previous operational difficulties in accessing, recording and improving data, and locating the drainage infrastructure in the field,” he said.

“The system does not just capture data, it handles the whole workflow from scheduling of inspections, to actually undertaking and completing the works as a result.

“Field workers can enter inspection and maintenance data directly into a portable tablet computer, eliminating the use of outdated and inaccurate maps, along with the associated difficulty of updating maps by hand in the field.

“Feedback from fieldworkers has been great. They find it easy to use, and the continual development of the application is mainly due to staff coming forward with ideas for upgrades and additional functionality.”

With a Stage 4 upgrade now imminent, Paul Bormann said the system will soon include more features for managing equipment and resources and will be able to handle OH&S and traffic control.

“The system will have a checklist reminding staff to ensure they have all bases covered before a particular job commences,” he said. “In the past, reporting on OH&S and traffic control was rarely done, and if it was, it was hard to find. This upgrade will allow all reports to be stored in the one location, and as they are electronic, they can easily be retrieved.”

The use of GPS in the workplace has often raised concerns of privacy, with some employees fearing policing by management. Frankston City was determined not to let this happen.

Paul Bormann consulted with and trained all field officers on the capabilities of GPS, ensuring employee confidence and trust, while demonstrating how to properly use the system.

“To replicate such a project, it is important to design and build the custom GIS application as a partnership,” he said.

“In this case, our Information Services Department continually works with the City Works Department to ensure the project meets its operational requirements.

“To avoid building a solution that did not match existing work processes, we held several workshops and demonstrations throughout the project design and implementation phases.”

It was identified early in the developmental process that the user interface would need to be very intuitive and easy to use, as the majority of the future users had limited computer experience.

This was achieved through innovative automations of GIS processes within the application, such as creation of work schedules.

Paul Bormann said the initiative has provided substantial benefits and cost savings for Council, allowing greater productivity through faster and more accurate location of drainage points.

For further information contact Paul Bormann on 1300 322 322.

 

Digital Editions


  • Greater Geraldton bridge lauded

    Greater Geraldton bridge lauded

    City of Greater Geraldton bridge replacement project wins prestigious engineering award Inovative engineering has earned the recently completed Nangetty-Walkaway Road Bridge Replacement Project top honours…

More News

  • Big attraction for tiny town

    Big attraction for tiny town

    Dozens of tourists have created history as the first passengers in decades to arrive in the tiny southern Queensland town of Thallon by rail. Excited passengers travelled for hours on…

  • Together Butchulla Talk

    Together Butchulla Talk

    A new Indigenous book celebrating the Butchulla language and local animals was launched at Hervey Bay Library earlier this month with storytime, language, dance and art activities for families to…

  • New Logan arena

    New Logan arena

    An upgraded arena for equestrians has officially opened at Skerman Park in North Maclean. Logan City Council delivered the $928,000 project, which includes a weatherproof roof, to support members of…

  • Noosa mastering AI

    Noosa mastering AI

    Digital Hub is trying to help Noosa locals get the most out of AI. Mastering AI can make life easier in countless ways. From planning weekly meals with specific dietary…

  • Change in the weather

    Change in the weather

    AUSSIE FLOOD RESCUE It’s obvious to everybody that we are seeing weather changes. It appears to be more erratic and frequent than ever before. Local government bodies are plagued by…

  • Dandycon set to return

    Dandycon set to return

    Dandy Con, Greater Dandenong’s much loved comic and pop culture festival, returns on Saturday 11 April 2026 between 11am–4pm, bigger than ever. This free, all ages event fills Dandenong Library,…

  • A creative future for Kingston

    A creative future for Kingston

    The community has been invited to help shape Kingston’s creative and cultural future. Kingston residents are being invited to help finalise the city’s cultural roadmap, with the Draft Creative and…

  • Tweed residents gunking up wastewater

    Tweed residents gunking up wastewater

    Tweed Shire Council is urging residents to rethink what they flush down the toilet and pour down the drain, after revealing that crews remove around 156 tonnes of rubbish and…

  • In memory of Chris Quilkey

    In memory of Chris Quilkey

    It was with great sadness that we learned that former Blacktown City Deputy Mayor and Councillor Chris Quilkey has passed away. First and foremost, our thoughts are with Chris’s family,…

  • Unit demolished as Ipswich flood recovery continues

    Unit demolished as Ipswich flood recovery continues

    Ipswich Mayor Teresa Harding has welcomed the demolition of Mihi Grove, a flood-hit 42-unit complex in Brassall purchased as part of the Queensland and Australian Government’s Resilient Homes Fund Voluntary…